How we prove a migration: run both until the difference is 0.00

Both systems ran side by side until the month-end reports matched exactly.

The checklist

  1. 1

    Run the old system and the new system side by side, on the same live data.

  2. 2

    Compare the same report from both systems, period by period.

  3. 3

    Investigate every difference before it is signed off — don't average them away.

  4. 4

    Only cut over once the difference is 0.00.

This is how Case A's month-end reports matched during the parallel run.